Dubai Autonomous Zone (DAZ): what was promised, and what has happened a year on

Updated 8 October 2026. First published September 2025, the week RTA announced the zone. Every status line below carries its source and date.

RTA announced the Dubai Autonomous Zone (DAZ) on 24 and 25 September 2025: a driverless transport area around Creek Metro station in Al Jaddaf, reaching Dubai Creek Harbour and Dubai Festival City, with seven driverless modes on land and water. Robotaxis were to come first, in early 2026, and all seven modes by mid-2027.

A year on, Dubai does have commercial robotaxis, since late March 2026. They run in Umm Suqeim and Jumeirah, on the other side of the city. We found no public RTA notice that services inside the zone have opened. For a Tesla owner, DAZ changes nothing about your own car: on a UAE plate it still runs Basic Autopilot.

Start where you are

What was promisedLocation, size, the seven modes, partnersSee the plan
What happened sincePromise against delivery, by dateSee the timeline
I own a TeslaWhat DAZ means for your carSkip to the verdict
Where robotaxis run todayOperators, zones, fleet figuresRead the robotaxi page
See it all on a mapRobotaxi zones, Metro, Loop and flying taxisOpen Dubai Autonomy

What RTA announced: seven driverless modes around Dubai Creek

RTA presented the zone at the fourth Dubai World Congress for Self-Driving Transport, at Dubai World Trade Centre. The congress challenge that year ran under the theme “Dubai Autonomous Transport Zone”, with five finalists: four consortia and one company (Dubai Media Office, 21 Sep 2025). During the congress RTA signed agreements with Emaar Properties and Al-Futtaim to extend the zone into Dubai Creek Harbour and Dubai Festival City, the two developers’ districts (Gulf News, 26 Sep 2025).

Estimated location of the Dubai Autonomous Zone around Creek Metro station in Al Jaddaf, Dubai Creek Harbour and Dubai Festival City
Estimated location of the Dubai Autonomous Zone, drawn by PlaidCars from the September 2025 announcement. RTA has not published a surveyed boundary.

Two size figures circulate, and they measure different things:

MeasureFigureSource
Area stretch, as RTA described it at launch15 kmKhaleej Times, 24 Sep 2025
Zone area in the Emaar and Al-Futtaim agreements12 km²Gulf News, 26 Sep 2025
Roads for Robobuses and Roboshuttles20 kmGulf News, 26 Sep 2025
Waterways for autonomous boats10 kmGulf News, 26 Sep 2025
Routes for delivery robots3.8 kmGulf News, 26 Sep 2025

RTA named seven modes for the zone. Their status as of 8 October 2026:

ModeRole in the zoneStatus, 8 Oct 2026
Dubai MetroEntry point at Creek station, Green LineRunning (driverless since 2009)
RobotaxiFirst mode to launchCommercial in Dubai since late March 2026, in Umm Suqeim and Jumeirah. No DAZ service announced.
RobobusRoads inside the zoneNo public launch found
Self-driving shuttleLast leg to homes and officesNo public launch found
Autonomous abraCreek crossings to Festival City and Creek HarbourNo public launch found
Driverless logistics vehiclesDeliveriesNo public launch found
Autonomous street sweepersRoad cleaningNo public launch found
Dubai Autonomous Zone layout presented by RTA in September 2025, linking land and water routes around Dubai Creek
Zone layout as presented in September 2025.

A year on: robotaxis arrived, in another part of Dubai

The robotaxi part of the plan has moved fast. The zone part has not, at least in public. Here is each promise next to what happened.

Promised (Sep 2025)What happened
Robotaxi trials by end of 2025WeRide public pilot on Uber with a specialist on board, Dec 2025. Apollo Go’s first fully driverless trial permit, 8 Jan 2026 (RTA).
Robotaxis open to the public in Q1 2026Commercial service by Apollo Go and WeRide from 30 and 31 Mar 2026, in Umm Suqeim and Jumeirah (RTA).
Zone operational in early 2026No public opening notice from RTA, Emaar or Al-Futtaim found as of 8 Oct 2026.
All seven modes by mid-2027Pending. Nine months to go.
Fleet growthApollo Go and Dubai Taxi Company plan 50 cars in year one, then more than 1,000 over the following years (Dubai Media Office, 2 Apr 2026). RTA’s latest program snapshot: 144 in the fleet, 48 active (19 Aug 2026).
25% of trips autonomous by 2030Still the city target, with 36% by 2040.

Read the fleet figures as separate dated snapshots, each with its own scope. Our robotaxi page for Tesla owners keeps the full table, the operators, the booking apps and an update log.

Two other projects touch the area. The Metro Blue Line will serve Dubai Creek Harbour; its first tunnelling phase is done and opening is set for 9 September 2029 (The National, 9 Jul 2026). The Dubai Loop is a separate tunnel between DIFC and Dubai Mall, outside the zone; as of 30 Sep 2026 its boring machine was still being assembled (Gulf News).

What the Dubai Autonomous Zone means if you own a Tesla

Very little for your own car, and that is worth knowing before anyone sells you a story.

  • Your Tesla runs Basic Autopilot on a UAE plate. Full Self-Driving (Supervised) and Enhanced Autopilot are off. A driverless zone does not switch them on. Our FSD and Autopilot in the UAE page has the details.
  • The zone’s vehicles are operator fleets. Robotaxis, robobuses and shuttles belong to Apollo Go, WeRide and RTA partners. Tesla is not among the named operators.
  • Price FSD claims at zero. If a used listing near Creek Harbour or anywhere else says “FSD activated”, check it on the car’s screen and value it at nothing until it is proven.
  • For a long hold, prefer HW4. It is the computer any future approval would target. See our hardware cliffs guide.

If you live in Creek Harbour or Festival City, the near-term change is more likely a robotaxi or shuttle ride than anything in your garage. Live Tesla stock is on Buy Tesla, with medians on our price index. To try one first, rent a Tesla in Dubai.

Dubai Autonomous Zone questions

Where is the Dubai Autonomous Zone?

Around Creek Metro station on the Green Line in Al Jaddaf, reaching Dubai Creek Harbour and Dubai Festival City. RTA has not published a surveyed boundary.

Is the Dubai Autonomous Zone open?

We found no public notice that services inside the zone have opened, as of 8 October 2026. RTA’s target for all seven modes is mid-2027.

Where can I ride a robotaxi in Dubai today?

In Umm Suqeim and Jumeirah, through the Apollo Go app or Uber’s autonomous option, since late March 2026. That area is outside the zone.

How big is the Dubai Autonomous Zone?

RTA described a 15 km stretch at launch. The agreements with Emaar and Al-Futtaim put the zone at 12 km², with 20 km of roads, 10 km of waterways and 3.8 km of delivery robot routes.

Will my Tesla drive itself inside the zone?

No. A UAE-registered Tesla runs Basic Autopilot. The zone’s driverless vehicles are operator fleets under RTA.

Sources: Dubai Media Office, congress announcement (21 Sep 2025) and Apollo Go with Dubai Taxi Company (2 Apr 2026); Khaleej Times, zone launch (24 Sep 2025); Gulf News, Emaar and Al-Futtaim agreements (26 Sep 2025) and Dubai Loop progress (30 Sep 2026); RTA releases on robotaxi permits and commercial launch (8 Jan, 30 Mar 2026) and program snapshot (19 Aug 2026); The National, Blue Line (9 Jul 2026).

Scroll to Top