Dubai’s relentless pursuit of world-class lifestyle enhancements takes another bold step with the Jebel Ali Beach Development Project, a transformative initiative under the Dubai 2040 Urban Master Plan. Spanning 6.6 kilometers along the Arabian Gulf coastline, this project reimagines Jebel Ali Beach as Dubai’s longest public beach: a vibrant haven designed to elevate happiness, well-being, and community access to nature. Aligned with the master plan’s ambitious goals to quadruple public beach lengths and double green spaces, it promises a seamless blend of leisure, innovation, and environmental stewardship, positioning Dubai as a global leader in sustainable urban coastal development.

Watch the launch video of the Jebel Ali Beach Development:
Launch of Jebel Ali Beach Project: Overview & Plan
On July 7, 2024, His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the Executive Council, greenlit the master plan and designs for the Jebel Ali Beach Development Project. This approval, announced via the Dubai Media Office, underscores Dubai’s commitment to its 2040 Urban Master Plan.



By 2025, early site preparations were underway, with full development targeted to support Dubai’s projected population growth to 5.8 million by 2040. This project not only revitalizes an underutilized coastal stretch but also integrates with nearby developments like Dubai South and the Expo 2020 site, creating a cohesive southern urban corridor.
Project Specifications: Scope, Location, and Design Elements
Located in the Jebel Ali area – southwest of Dubai’s urban core and adjacent to the Jebel Ali Free Zone – this 6.6 km linear beachfront will feature undulating dunes, shaded pavilions, and seamless pathways connecting to inland green corridors. The design emphasizes low-impact architecture inspired by desert and marine motifs, with structures like sculptural walkways and eco-pavilions that minimize visual intrusion while maximizing functionality. Key specs include:
Feature | Details |
---|---|
Length | 6.6 km (Dubai’s longest public beach) |
Access Improvements | 100% beach development; 400% increase in public beach services |
Night Swimming | Expanded illuminated zones for safe, extended-use recreation |
Green Integration | Over 1 km of shaded walkways; native planting to enhance biodiversity |
Connectivity | Links to Dubai Metro (Route 2020 extension) and cycling paths |
The project’s footprint prioritizes the protection of local ecosystems, including migratory bird habitats and marine life, through permeable surfaces and zero-waste drainage systems. As part of the 2040 plan’s marine development zone, it allocates 20% of the site to conservation, ensuring the beach evolves as a resilient, climate-adaptive space.

What to Expect: Recreational Hubs, Sustainability, and Community Impact
The Jebel Ali Beach Development Project is more than a shoreline upgrade—it’s a pillar of Dubai’s “happiness and quality of life” agenda, offering diverse amenities for all ages. Envision family-friendly zones with splash pads and yoga decks alongside adventure spots for water sports and sunset strolls. Sustainability is at the core: solar-powered shading, recycled water features, and AI-monitored erosion control will reduce the project’s carbon footprint by 30% compared to traditional developments.
Key expected features include:
- Leisure Zones: Umbrella-shaded lounges, beach volleyball courts, and pop-up markets for local artisans.
- Eco-Initiatives: Mangrove restoration and “blue-green” corridors linking to inland parks, boosting biodiversity by 25%.
- Tech Touches: Smart apps for real-time tide alerts, reservation-free access, and AR-guided eco-tours.
- Inclusivity: Wheelchair-accessible paths and family pods to serve Dubai’s diverse 200+ nationalities.
By 2030, the beach is projected to host over 2 million annual visitors, contributing AED 500 million to the local economy through tourism and events. This aligns with the 2040 plan’s social pillar, aiming for 55% of residents within 20 minutes of green spaces

Timeline for Jebel Ali Beach Development: From Approval to Coastal Legacy
The project follows a phased rollout integrated into the Dubai 2040 Urban Master Plan’s broader timeline, with early wins already evident by mid-2025.
Milestone | Date/Target | Details |
---|---|---|
Master Plan Approval | July 2024 | Sheikh Hamdan’s directive; designs finalized by Dubai Municipality. |
Site Preparation | Q4 2024 – Q2 2025 | Environmental surveys and dune stabilization. |
Phase 1 Opening | End of 2025 | Initial 2 km stretch with basic amenities and pathways. |
Full Development | 2027–2030 | Complete 6.6 km; integration with metro extensions. |
2040 Integration | By 2040 | Supports 400% beach expansion goal; annual eco-audits. |
This timeline positions Jebel Ali Beach as a flagship for the 2040 plan’s peri-urban zone, enhancing southern Dubai’s appeal alongside projects like the Dubai Autonomous Zone.